Pyrite Remediation Scheme

Pyrite Resolution Board Statistics: Third Update

Pyrite Resolution Board Statistics

The Pyrite Resolution Board (PRB) has produced eight reports since the Pyrite Remediation Scheme was introduced in February 2014. Further statistics are provided on the PRB website and in recent news articles. See statistics below and follow links for original data.

Statistics reporting in the eighth quarterly report of the PRB:

26th February 2014 to 4th January 2016:

  • 995 completed applications
  • 37 developments containing multiple applications
  • 63 single site applications
  • 809 Validated applications
  • 744 applications included in scheme
  • 163 dwellings completed remediation
  • Works contractors in place for 184 dwellings
  • Tendering underway for 104 dwellings
  • Remedial Works Plans under preparation for 246 dwellings
  • 17 applications refused
  • No outstanding appeals
  • PRB received a total of €484,000 from liable parties in 2015

 

Statistics reporting in the seventh quarterly report of the PRB:

Report not available on the PRB website.… Read the rest

Ireland: Second Update on Pyrite Resolution Board Statistics

Pyrite Resolution Board STATISTICS

The Pyrite Resolution Board (PRB) has produced six reports since the Pyrite Remediation Scheme was introduced in February 2014. Further statistics are provided on the PRB website and in recent news articles. See statistics below and follow links for original data.

Pyrite Resolution Board Statistics reported in the sixth quarterly report of the PRB:

26th February 2014 to 3th June 2015:

  • 763 completed applications
  • 33 developments containing multiple applications
  • 49 single site applications
  • 637 Validated applications
  • 520 applications included in scheme
  • Pilot project of 5 dwellings remediated (September to November 2014)
  • 16 dwellings completed remediation in 2015
  • Works contractors in place for 132 dwellings
  • Tendering underway for 65 dwellings
  • Remedial Works Plans under preparation for 163 dwellings
  • Anticipated 236 dwellings to be remediated in 2015
  • 11 dwellings refused from scheme (five have appealed)
  • In 5 cases, agreement has reached with builders/developers regarding contribution towards cost of remediation of 67 dwellings

Pyrite Resolution Board Statistics reported by the Pyrite Resolution Board for 7th June 2015:

  • Total 763 applications (significant pyritic damage)
  • 115 applications in Validation Stage
  • 117 applications at Verification Stage
  • 520 applications included in the scheme
  • 8 applications refused

Pyrite Resolution Board Statistics reported by the Pyrite Resolution Board for 1st May 2015:

  • Total 712 applications (significant pyritic damage)
  • 107 applications in Validation Stage
  • 97 applications at Verification Stage
  • 508 applications included in the scheme
  • 7 applications refused

Pyrite Resolution Board Statistics reported in the fifth quarterly report of the PRB:

26th February 2014 to 31st March 2015:

  • 697 completed applications
  • 33 developments containing multiple applications
  • 49 single site applications
  • 583 Validated applications
  • 496 applications included in scheme
  • Pilot project of 5 dwellings remediated (September to November 2014)
  • Remediation of 20 dwellings commenced in February 2015
  • Contractors appointed to 72 dwellings in March 2015
  • Testing underway for 63 dwellings
  • Remedial Works Plans under preparation for 179 dwellings
  • 11 dwellings refused from scheme (three have appealed)

Pyrite Resolution Board Statistics reported in the fourth quarterly report of the PRB:

26th February 2014 to 1st January 2015:

  • 622 completed applications
  • 27 developments containing multiple applications
  • 47 single site applications
  • 483 Validated applications
  • 321 applications included in scheme
  • Average 3 applications per week since 3rd quarterly report
  • 2 appeals in process
  • Pilot project of 5 dwellings remediated (September to November 2014)

The Irish Independent reported an update on the Pyrite Remediation Scheme statistics for the end of January 2015:

  • Total 632 applications
  • 485 applications Validated
  • 328 applications included in scheme
  • Work at tender stage for 73 dwellings
  • Work completed on 5 dwellings

Pyrite Resolution Board Statistics reported by the Pyrite Resolution Board for 31st October 2014:

  • Total 590 applications
  • 151 applications in Validation Stage
  • 231 applications at Verification Stage
  • 208 applications included in the scheme

Pyrite Resolution Board Statistics reported by the Pyrite Resolution Board for 7th October 2014:

  • Total 575 completed applications and 36 commenced applications
  • 144 applications in Validation Stage
  • 220 applications in Verification Stage
  • 2 Verified applications awaiting decision
  • 206 applications included in the scheme
  • Remediation contracts in place for 5 dwellings
  • 3 applications not considered

Pyrite Resolution Board Statistics reported by the Pyrite Resolution Board for 4th July 2014:

  • Total 521 completed applications and 35 commenced applications
  • 312 applications in Validation Stage
  • 127 applications in Verification Stage
  • 27 Verified applications awaiting decision
  • 52 applications included in the scheme
  • 3 applications not considered
Pyrite Resolution Board Statistics reported by the Pyrite Resolution Board for 15th April 2014:
  • 418 completed applications and 146 commenced applications
  • 84 applications Validated and referred to Verification Stage
Read the rest

Pyrite Resolution Board report: 2014

Pyrite Resolution Board Report 2014

The Pyrite Resolution Board report (for 2014) was published on 17th June 2015. The report PDF can be found on the Pyrite Resolution Board website, or by clicking this link.

Applications Summary (END of 2014)

The PRB first annual report provides a summary of applications to the Board. Photographs of typical damage and the remediation process are included within the report. At the end of 2014, the applications were as follows:

620 applications in total
145 applications at Validation (including 6 refused applications)
171 applications Validated, at Verification
3 applications Verified and awaiting decision on inclusion
301 applications Included in scheme
106 applications in Planning/Scheduling
190 applications at Specification and Tender Preparation stage
0 applications in Remediation
5 applications Remediated

expenditure

The total expenditure reported for 2014 was reported as €796,969, with the following breakdown:
IT System Setup €72,320
Engineers €145,380 (€306,722 outstanding at end of 2014)
Works Contractors €144,371 (€3,701 outstanding at end of 2014)
Homeowner’s Payments €142,756
Administration & Overheads €292,142
The above can also be considered in terms of proportions of the whole expenditure (own calculations, not those of the PRB):
IT System Setup (9 %)
Engineers (18 %)
Works Contractors (18 %)
Homeowner’s Payments (18 %)
Administration & Overheads (37 %)
An additional €1,663,224 is possible for future payments “…in respect of the 301 dwellings included in the Scheme in 2014 for the Building Condition Assessment, alternative accommodation and storage…”

legal proceedings

The PRB report states that “…legal proceedings by the PRB against a developer in respect of 17 dwellings have commenced and it is anticipated that others will follow.Read the rest

Ireland: Update on Pyrite Resolution Board Statistics

Pyrite Resolution Board Statistics of Applications

This post provides information of the Pyrite Resolution Board Statistics. The Pyrite Resolution Board has produced four reports since the Pyrite Remediation Scheme was introduced in February 2014. Further statistics are provided on the PRB website and in recent news articles. See statistics below and follow links for original data.

Statistics reported by the Pyrite Resolution Board for 1st May 2015:

  • Total 712 applications (significant pyritic damage)
  • 107 applications in Validation Stage
  • 97 applications at Verification Stage
  • 508 applications included in the scheme
  • 7 applications refused

Statistics reported in the fourth quarterly report of the PRB:

26th February 2014 to 1st January 2015:

  • 622 completed applications
  • 27 developments containing multiple applications
  • 47 single site applications
  • 483 Validated applications
  • 321 applications included in scheme
  • Average 3 applications per wee since 3rd quarterly report
  • 2 appeals in process
  • Pilot project of 5 dwellings remediated (September to November 2014)

The Irish Independent reported an update on the Pyrite Remediation Scheme statistics for the end of January 2015:

  • Total 632 applications
  • 485 applications Validated
  • 328 applications included in scheme
  • Work at tender stage for 73 dwellings
  • Work completed on 5 dwellings

Statistics reported by the Pyrite Resolution Board for 31st October 2014:

  • Total 590 applications
  • 151 applications in Validation Stage
  • 231 applications at Verification Stage
  • 208 applications included in the scheme

Statistics reported by the Pyrite Resolution Board for 7th October 2014:

  • Total 575 completed applications and 36 commenced applications
  • 144 applications in Validation Stage
  • 220 applications in Verification Stage
  • 2 Verified applications awaiting decision
  • 206 applications included in the scheme
  • Remediation contracts in place for 5 dwellings
  • 3 applications not considered

Statistics reported by the Pyrite Resolution Board for 4th July 2014:

  • Total 521 completed applications and 35 commenced applications
  • 312 applications in Validation Stage
  • 127 applications in Verification Stage
  • 27 Verified applications awaiting decision
  • 52 applications included in the scheme
  • 3 applications not considered
Statistics reported by the Pyrite Resolution Board for 15th April 2014:
  • 418 completed applications and 146 commenced applications
  • 84 applications Validated and referred to Verification Stage
Read the rest

Update on Pyrite Resolution Board applications

Pyrite Resolution Board Applications

The Pyrite Resolution Board (PRB) has produced three reports since the Pyrite Remediation Scheme was introduced in February 2014. Further statistics are provided on the PRB website and in recent news articles. See statistics below and follow links for original data.

The Irish Independent reported an update on the Pyrite Remediation Scheme statistics last week for the end of January 2015:

  • Total 632 applications
  • 485 applications Validated
  • 328 applications included in scheme
  • Work at tender stage for 73 dwellings
  • Work completed on 5 dwellings

Statistics reported by the Pyrite Resolution Board for 31st October 2014:

  • Total 590 applications
  • 151 applications in Validation Stage
  • 231 applications at Verification Stage
  • 208 applications included in the scheme

Statistics reported by the Pyrite Resolution Board for 7th October 2014:

  • Total 575 completed applications and 36 commenced applications
  • 144 applications in Validation Stage
  • 220 applications in Verification Stage
  • 2 Verified applications awaiting decision
  • 206 applications included in the scheme
  • Remediation contracts in place for 5 dwellings
  • 3 applications not considered

Statistics reported by the Pyrite Resolution Board for 4th July 2014:

  • Total 521 completed applications and 35 commenced applications
  • 312 applications in Validation Stage
  • 127 applications in Verification Stage
  • 27 Verified applications awaiting decision
  • 52 applications included in the scheme
  • 3 applications not considered
Statistics reported by the Pyrite Resolution Board for 15th April 2014:
  • 418 completed applications and 146 commenced applications
  • 84 applications Validated and referred to Verification Stage
Read the rest